Skip to content

Launch offer for the first 50 contractors. First month free, then $3.80/month for months 2 and 3. Claim your spot

A remodeled covered back porch with an outdoor kitchen, a grill, a ceiling fan and an outdoor sofa set.

Blog

How to Set Up a Payment Schedule for a Remodeling Job

Updated

Example project photo.

A payment schedule answers the homeowner’s quietest question: “When do I pay, and for what?” Get it right and money never becomes the awkward part of the job. Get it wrong and you end up chasing a payment the homeowner doesn’t think is due yet.

The rule that makes it work: tie every payment to something the homeowner can see.

What a good payment schedule does

  • It tells the homeowner exactly how much is due and when, before they sign.
  • It keeps you ahead of your costs: materials, subs and labor.
  • It makes each payment feel earned, because the homeowner can see the work that triggered it.
  • It leaves enough at the end that finishing well matters to both of you, without leaving you carrying the whole job.

Stay ahead of your costs.

  • Payments received
  • Money spent
Illustration, not real job data.

Start with the deposit

The deposit secures the job on your schedule and covers what you spend before work starts: ordering materials, special order items, permits, design time.

Two things make a deposit easy to accept:

  1. Say what it covers. “The deposit holds your start date and covers the cabinet order, which has to be placed six weeks ahead.” A homeowner who knows why will rarely push back on how much.
  2. Keep it in proportion. A deposit that covers early costs reads as fair. A deposit that covers most of the job reads as a risk.

Check your state’s rules. Some states limit how much a contractor can collect before work starts on a home improvement job, or set conditions on large deposits. The limits vary, and they change. Look up your state’s home improvement or contractor licensing rules before you set a standard deposit.

Tie progress payments to milestones they can see

“Second payment” tells the homeowner nothing. “Due when the cabinets are installed” tells them everything. Milestones work best when they are:

  • Visible. The homeowner can walk in and see it’s done.
  • Unambiguous. “Rough plumbing and electrical complete” or “Inspection passed,” not “about halfway.”
  • Spread with your costs. Put a payment right after your biggest spending, not long after it.

Good milestones for most remodels:

  • Demolition complete
  • Rough plumbing and electrical complete (or rough inspection passed)
  • Drywall complete
  • Cabinets installed
  • Tile complete
  • Final walkthrough

Good trigger or not?

Example payment schedules

These are examples to adapt, not recommendations for your state or your margins.

Job size

  1. 30%$9,075At signing
  2. 40%$12,100When rough plumbing and electrical are complete
  3. 30%$9,075After the final walkthrough

Payment schedule

Deposit at signing: $9,075. This holds your start date and covers the tile and vanity order.

Due when rough plumbing and electrical are complete: $12,100.

Final payment after the walkthrough: $9,075.

Approved changes are added to the next payment.

Example only. Check your state’s rules on deposits.

Small job (a few days of work): two payments

PaymentWhen it’s due
30% depositAt signing
70% finalWhen the work is complete and we’ve walked through it with you

Mid size job (bathroom, deck, flooring): three payments

PaymentWhen it’s due
30% depositAt signing, to hold your start date and order materials
40% progressWhen rough plumbing and electrical are complete
30% finalAfter the final walkthrough

Large job (kitchen, addition, whole floor): four or five payments

PaymentWhen it’s due
DepositAt signing, covering the cabinet order and permits
Progress 1When demolition and rough plumbing and electrical are complete
Progress 2When cabinets and countertops are installed
Progress 3When tile and trim are complete
FinalAfter the final walkthrough and punch list

How changes fit in

Most remodels change. Say in the proposal how a change is paid: usually with the next scheduled payment after the homeowner approves it in writing. That keeps the final payment from turning into a stack of surprises. For wording, see step 6 of How to Write a Construction Scope of Work.

How to word it in the proposal

Put the schedule in its own section, in plain words. For example:

Payment schedule

Deposit at signing: $9,075. This holds your start date and covers the tile and vanity order.

Due when rough plumbing and electrical are complete: $12,100.

Final payment after the walkthrough: $9,075.

Approved changes are added to the next payment.

Exact amounts are clearer than percentages alone. If you show percentages, show the dollar amount next to each.

Mistakes to avoid

  • Dates instead of milestones. “Due October 15” becomes a problem the moment a delivery slips.
  • A tiny final payment. If almost nothing is left at the end, finishing the last small items is easy for everyone to put off.
  • A huge final payment. If most of the money is due at the end, you’re financing the job.
  • Surprise payments. Every payment should be in the proposal they signed, plus approved changes. Nothing else.

Explain it before they read it

Walk the homeowner through the schedule when you go over the estimate. One sentence per payment: what triggers it and why. It’s two minutes that makes every later payment routine.

For the rest of the proposal, see How to Write a Contractor Proposal: 7 Guidelines, especially guideline 6, “Explain what happens next.”

Get Workbencher

Good work deserves a great pitch.

Every Workbencher proposal includes a payment schedule. It starts at 20% at signing and 80% on completion, and you change the labels and percentages to fit the job. You collect payment the way you already do. Create your first proposal today.

Common questions

How much should a contractor ask for as a deposit?

Enough to cover your costs before work starts, and no more than your state allows. Many contractors land somewhere between 10% and a third of the job for remodels, more when special order materials go in early. Check your state’s rules first.

Should payments be tied to dates or milestones?

Milestones. A date can arrive before the work does. A milestone the homeowner can see makes every payment easy to understand.

How many payments should a remodeling job have?

Two for small jobs, three for most bathroom, deck and flooring jobs, four or five for kitchens and larger remodels. More payments than milestones the homeowner can see is too many.

When should the final payment be due?

After the final walkthrough, when the work described in the proposal is done. Say in the proposal how small punch list items are handled so they don’t hold up the whole payment.